Customization: | Available |
---|---|
Type: | Cold Stamping |
Processing Type: | Deep Drawing |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Cangzhou Yifeng Hardware Manufacturing Co., Ltd. (YFEGER)was founded in July 2000. It's located in Nanpi County, Cangzhou City, which has a long history and is known as the "Hometown of Hardware". The history more than 20 years .We're focusing on design, production and sales of precision stamping parts, sheet metal parts, copper bars, electronic components, chassis cabinets and other metal products as well as injection molding products. Products are widely used in communications, electric power, automation, new energy, automobiles, high-speed rail, construction machinery, medical equipment and other fields.
Item name | Deep Drawn Custom Stamping Parts-Sheet Metal Part Factory-Auto Part |
Design | We use the most advanced die design software Auto CAD, Pro/E, Solidworks, |
UG (dwg, dxf, IGS, STP, X-T) | |
Processing Type | Multistep Progressive Dies |
Tolerance | as per customers' requirement. |
Material | Carbon Steel, Aluminum, Brass, Stainless steel etc. |
Process | Laser cutting, stamping, machining, bending, deep drawing, welding, riveting, |
plating, polishing, brushing, painting, powder coating, assembly etc | |
Surface Treatment | Cleaning, Anodizing, Plating, Galvanize, Tempered, heat treatment, |
electrophoresis, Paint, Powder Coating, Polishing, Brushing, Silkscreen etc. | |
Type | Cold stamping |
Industry Of Use | Automobile, Manufacturing Machinery, Electronics, Industrial Equipment, |
Electrical, Construction&Decoration, Lighting, Transportation, Medical, | |
Sample Lead-time | Within 1 day for samples available from our stock About 1-2weeks |
for custom samples | |
Mass Production Lead-time | 2-5 weeks after receiving deposit |
Payment Terms | EXW/FOB Tianjin or any other airport or seaport, China |
Payment | 30% deposit, balance against B/L copy |
Delivery Time | 2-4 weeks according to production process and order qty. |
Package | Carton,Wooden Case or as Required |
Service Type | OEM&ODM |
Inspection | In-house or third party, all the products are strictly inspected by skilled QC |
Certification | ISO9001,SGS Certification. |
Main customers | See above |
MOQ | Flexible, according to customer's requirement |
Convenient Location | 3hrs' driving to Beijing Airport, 2.5 hrs' driving to Tianjin seaport. |
FAQ | ||||||||
Q1. | What is your main products? | |||||||
A1: | Our main products are sheet metal parts, chassis, cabinet, deep drawn parts, stamping parts and machined parts. | |||||||
Q2. | How to ensure that every process's quality? | |||||||
A2: | Every process will be checked by our quality inspection department which insures every product's quality. In the production of products, we will personally go to the factory to check the quality of products. | |||||||
Q3. | How long is your delivery time? | |||||||
A3: | Our delivery time is generally 15 to 45 days. Or according to the quantity. | |||||||
Q4. | What is your payment method? | |||||||
A4: | 30% value of T/T in advance and other 70% balance on B/L copy. For small order less than 1000USD, would suggest you pay 100% in advance to reduce the bank charges. | |||||||
Q5: | Can u customize my products in special shape? | |||||||
A5: | Yes,we can offer OEM and ODM |