Customization: | Available |
---|---|
Surface Treatment: | Tin Plated |
Certification: | RoHS, GB, ISO9001 |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Copper Bus-bar Products | |
Description | Custom processing of various copper bus bar |
Finish | Polishing, Drawbench, Electroplated nickel, electroplated tin, dipping glue,PE heat shrink tubes |
Drawing Formation | PDF, CAD/DWG/DXF, IGS/STP etc |
Inspection Equipment | Micrometer, Callipers, Tensile Machine, Spectrograph, Three-Dimensional etc. |
Tolerance | According to actural conditions |
Material | Brass, red copper, beryllium bronze, etc |
Item name | sheet metal parts ,sheet metal stamping, metal bracket, copper busbar, deep drawing |
Design | We use the most advanced die design software Auto CAD, Pro/E, Solidworks, |
UG (dwg, dxf, IGS, STP, X-T) | |
Processing Type | Multistep Progressive Dies |
Tolerance | as per customers' requirement. |
Material | Carbon Steel, Aluminum, Brass, Stainless steel etc. |
Process | Laser cutting, stamping, machining, bending, deep drawing, welding, riveting, |
plating, polishing, brushing, painting, powder coating, assembly etc | |
Tolerance | ±0.02mm to ±0.2mm. |
Surface Treatment | Cleaning, Anodizing, Plating, Galvanize, Tempered, heat treatment, |
electrophoresis, Paint, Powder Coating, Polishing, Brushing, Silkscreen etc. | |
Type | Cold stamping |
Industry Of Use | Automobile, Manufacturing Machinery, Electronics, Industrial Equipment, |
Electrical, Construction&Decoration, Lighting, Transportation, Medical, | |
Sample Lead-time | Within 1 day for samples available from our stock |
About 1-2weeks for custom samples | |
Mass Production Lead-time | 2-5 weeks according to production process and order qty after receiving deposit. |
Trading Terms | EXW/FOB Tianjin or any other airport or seaport, China |
Payment Terms | 30% deposit, balance against B/L copy |
Package | Carton,Wooden Case or as Required |
Service Type | OEM&ODM |
Inspection | In-house or third party, all the products are strictly inspected by skilled QC |
Certification | ISO9001, BV Certification. |
Main customers | See Below |
MOQ | Flexible, according to customer's requirement |
Convenient Location | 3hrs' driving to Beijing Airport, 2.5 hrs' driving to Tianjin seaport. |
Welcome To YIFENG HARDWARE | |||||||||||||
(One-stop Custom Metal Service Factory With 20 Years' Experience) | |||||||||||||
1.Your one-stop shop for all your contract manufacturing needs for precision manufactured parts. We offer complete capabilities--engineering, tools, fixtures, prototyping, precision stamping, precision CNC machining, die casting, sheet metal cutting, CNC bending, CNC punching, welding and assembly. 2.Your source for complete small, medium or large sized mechanical assemblies, including assembly, insertion, welding,grinding,plating, powder-coating and packaging. 3.We take pride in our Just-in-Time record. All Yifeng employees are dedicated to manufacturing your part to your specifications every time. 4.We want to exceed our customer's expectations. Whether your project is large or small, Yifeng commits all our resources to ensure your project meets your expectations. 5.We are the precision metal working expert; we do the tight tolerance, complex parts that others can't do. |
FAQ | ||||||||
Q1. | What is your main products? | |||||||
A1: | Our main products are sheet metal parts, chassis, cabinet, deep drawn parts, stamping parts and machined parts. | |||||||
Q2. | How to ensure that every process's quality? | |||||||
A2: | Every process will be checked by our quality inspection department which insures every product's quality. In the production of products, we will personally go to the factory to check the quality of products. | |||||||
Q3. | How long is your delivery time? | |||||||
A3: | Our delivery time is generally 15 to 45 days. Or according to the quantity. | |||||||
Q4. | What is your payment method? | |||||||
A4: | 30% value of T/T in advance and other 70% balance on B/L copy. For small order less than 1000USD, would suggest you pay 100% in advance to reduce the bank charges. | |||||||
Q5: | Can u customize my products in special shape? | |||||||
A5: | Yes,we can offer OEM and ODM |